Harris Pond Dam
Masonry Reconstruction
Nashua, New Hampshire
The Turner Group was selected for the design and construction administration for the Harris Pond Dam Masonry Restoration. Work includes a new spillway cap with four manual gates, new 6’x6’ deep gate, intake, gate house, and liner for the existing 5’ diameter penstock for the 35’ high ashlar, stone masonry arch dam.